Land issues are an important part of pipeline development and operation, and need to be considered:
  • When selecting a pipeline route;
  • When acquiring a pipeline easement;
  • When taking into account environmental considerations during construction; and,
  • Over the lifetime of the pipeline once reinstatement has occurred (easement management).

A geographical information system (GIS) is a database that stores information linked to various geographical locations, allowing for the management of spatial data. In combination with a global positioning systems to determine exact locations, GIS’ can provide essential information required for the engineering and design of a pipeline. Information such as steel property, depth of burial and coating condition can be provided for a specific point along a pipeline using a GIS.

Often pipeline routes run through private land and it is important for pipeline owners to maintain a good relationship with landholders during the easement acquisition process. This relationship is usually facilitated by a landholder liaison agent, who can use his or her extensive knowledge of easement documentation, land acquisition legislation, compensation knowledge and rural experience in combination with their knowledge of the project to ensure all parties are satisfied.

Environmental consultants are required to assess what kind of flora and fauna will be impacted by the construction of a pipeline. Environmental auditors are often involved in the construction process to ensure that proponents are following correct procedure, and that the process is compliant to government regulations.

Pipeline standards location classes determine how a pipeline will be designed and operated in order to minimise danger and damage to other land users. However, an increasingly salient issue in the pipeline industry is encroachment, which is when urban development occurs around a pipeline which has already been constructed, increasing the likelihood of third party damage.
More Less

Latest News

Upgrade available for X-Info Maps and X-Info DBYD: Mipela Geosolutions

A major upgrade for the X-Info Maps and X-Info DBYD Version 5.5 is now available and contains enhanced features and additional functionality with both administrator and user in mind.
 
Arrow’s Bowen Pipeline receives approval

Arrow Energy’s proposed Bowen Pipeline, locat...

New Federal CSG regulations to be implemented

The Federal Government is set to implement grea...

More
 

Related Companies

URS Australia Pty Ltd
Artarmon, NSW, Australia
 
RPS
Fortitude Valley, QLD, Australia
 
Fyfe Pty Ltd
Adelaide, SA, Australia
 
Nacap Australia Pty Ltd
Doncaster, VIC, Australia
 
KBR (Kellogg Brown & Root Pty Ltd)
 
More

Related Events

EPCRC/RSC Seminar

Stamford Plaza Adelaide
 

APIA WA Chapter Christmas Lunch

Royal Perth Yacht Club
 
More

Basket is empty.
 

Advertisement Advertisement Advertisement Advertisement

Advertisement